Monday, 24 September 2012

Stage 3: 1:2 Scale Mockup


Standard 250mm tall bucket with spout and handle removed. Covered with grease-proof paper, screws added to wrap rope around.



10m of cotton rope soaked in 1:1 PVA and water mixture. Wrapped around bucket around screws.


Scale model, 48 hours on the mould.





Stage 2: Concepts




Monday, 27 August 2012

Stage 1: Research Part B

Material Testing 
Photo Essay


Straight walled drinking glass wrapped in cling wrap then grease-proof paper, to be removed once glue is dry 




Cotton string soaked in PVA glue prior to wrapping




String and twine wrapped around the glass and pen in an even pattern, left to dry.



Grease-proof paper removed once glue has dried. This was far more difficult for the pen, structure was damaged trying to remove it.



Cylinder tested under load. String collapsed under 91g, twine under 74g. Collapse was gradual though.



Beam tested under load. Twine collapsed under 35g, String collapsed under 110g



Larger scale proof of concept. Loose cotton cord, 1:1 PVA to water mix


Monday, 13 August 2012

Stage 1: In-class Experimentation


Week 1



6 strands of spaghetti, 30cm of tape, 20 minutes  
Supported ~ 600g


Week 2



1 A3 Sheet of card, 30cm of tape, 60 minutes 
Supported  > 65kg

Stage 1: Thonet No. 14 Detailed Exploration